2000-2001: Solids & Parameter Modeling New York, NY |
||||||
|
The Metropolitan Transit Authority has begun a ten-year, $6 billion expansion project that will connect two existing underground train lines via new cut-and-cover and bored tunnel operations. (see map). Through the development and application of sophisticated 3D geologic and parameter models, Hazlett-Kincaid will be working with a joint venture of a large transportation engineering firm and an environmental group to optimize characterization and excavation strategies and minimize environmental costs. |
![]() |
|||||
|
|
LNAPL - near proposed cut & cover construction | |||||
|
In later stages of the project, groundwater flow and contaminant transport models will also be developed in order to quantify the impacts of the tunneling and cut-and-cover operations on existing and future subsurface conditions.
|
||||||
| Above - 3-D solids and parameter model of the site in Long Island (site map shown in above left). Model depicts the 3-D distribution of hydraulic conductivity above the bedrock surface and the orientation of proposed tunnels and cut and cover excavations. | ||||||
ŠThis site and all of its contents are copyright Hazlett-Kincaid, Inc., 2002.